最新报道:MiningStore has launched a 10 MW air-cooled Bitcoin mining facility in Iowa, expanding its MISO grid operations with over 3,500 ASIC miner slots. The first 5 MW phase is operational, and the remaining 5 MW is set for completion by October 2025. The containerized facility targets 99% uptime and integrates demand-response capabilities to support grid reliability. CEO JohnPaul Baric emphasized its alignment with cost-effective power and institutional-grade operations as Bitcoin mining matures into an asset class.